Back up cursor centered over detected utility from backing up GPR system perpendicular to pipe. Target marked at midpoint of transducer on the ground surface.
Multiple utility targets GPR transducer moved perpendicular to pipe (the three arrows)
Pipe reflection from traversing GPR transducer along the pipe (to the right)
Concrete slab cover with rebar targets (small hyperbolas) (top, left)
6″ plastic water line (middle)
Download PDF with data examples, here